Plenary Industrial Plant Project Design

  • Survey (Soil investigation, Topographic measurements),
  • Feasibility (Preliminary project and preliminary cost studies correspondent with process),
  • Calculations (Static, Electrical and Mechanical Calculations),
  • Drawings (Architectural, Static, Electrical and Mechanical drawings).

Renewable Energy Systems Project Design

  • Survey (Soil investigation, Topographic measurements),
  • Calculations (Static, Electrical and Mechanical Calculations),
  • Drawings (Architectural, Static, Electrical and Mechanical drawings).

Project Management Services

  • Design studies,
  • Master plan preparation,
  • Project Design and Management

Concept Descriptions

What is;

  • Survey (soil survey, topographic measurements),

It is a possible earthquake to determine the reaction of the residual dynamic parameters of the ground, ground, geological structure type, depth, thickness, density, electrical resistance, seismic velocity, acceleration, groundwater depth and the underground layers in the plant areas to be established. Ground survey.

Soil investigation, ground information to be used in the design phase of the plant is determined; The report on whether there is a risk level of the soil – stone type in all floors, the risk level of the region in terms of earthquake risk and whether there is a distance to a possible fault line as a result of a detailed examination of the information obtained is suitable for the construction of the plant. (seismic, electric, magnetic, electromagnetic, gravity, radioactivity)

In order to minimize damage to the earthquake zones, a soil survey is required.

Concept Descriptions

What is;

  • Feasibility (Alternative project and preliminary cost studies for the process),

People want to know that the people of how much will have cost before they start building buildings in every period. The purpose of cost estimation is to define the cost of providing the desired service or product level by using limited resources in the most efficient way. Ensuring maximum productivity is only possible by accurately estimating the costs required to complete the task in question and effectively managing them within the framework of accepted cost limits. In short, the cost estimate is to look at today and yesterday and try to determine the costs of the work to be done tomorrow.

Accurately calculated projects are the most economical projects, while low or high estimates cause more spending.

Low cost estimates mean they contain more than the estimated value in the design. The reason for this is the neglect of important components as a result of poor planning and estimates. Low-cost estimates will lead to project delays, a second formation of the organization, deviation in planning, and inability to achieve the projected profit target due to unforeseen costs.

High cost estimates lead to unexpected results such as low cost estimates. Although the project can be implemented at a lower cost, over-calculated budgets will be spent under the name of a budget equalization. The project seems to be completed at a lower cost at the end, but will actually be taken for more cost.

Concept Descriptions

What is;

  • Calculations (Static, Electrical and Mechanical Calculations),

Development of the architectural project of the facility, after the preparation of the preliminary project, Civil Engineers, foundation, roof, reinforced concrete, steel, retaining wall and so on. Calculates how the elements should be made against the acting forces.

Concept Descriptions

What is;

  • Drawings (Architectural, Static, Electrical and Mechanical drawings).

Static, Electrical and Mechanical Calculations and projects based on these calculations.